View previous topic :: View next topic |
Author |
Message |
Whyman Newbie
Joined: 04 Apr 2005 Posts: 1
|
Posted: Mon Apr 04, 2005 Post subject: Bugreport for 3.13.2005-0318 Beta |
|
|
i just found some bugs in the last beta relesease:
- export problem: rounded work cost is not used when exporting to ascii or xml
- when timing short periods (< rounding time) work cost is not calculated correctly
the rounding features are great, just what i needed  |
|
Back to top |
|
 |
syntap Site Admin
Joined: 09 Sep 2003 Posts: 132
|
Posted: Tue Apr 05, 2005 Post subject: |
|
|
Yeah, I still need to code the changes into the export sections.
Work cost should be calculating correctly as long as the final real work time is at least a minute past the increment, i.e. 30 minutes 59 seconds is still a 30-minute increment, 31 minutes is 60 minutes. If you see a situation where you hit F8 and the correct incremented cost isn't showing then let mem know. There is still a problem with showing the work time cost correctly when loading a project... hitting F8 gets things to recalculate correctly but it's another thing that needs fixing.
Thanks for the feedback! |
|
Back to top |
|
 |
|